General rule of thumb states that the control room should be as symmetrical as possible. In my design, the center ridge of the control room ceiling was not centered due to the location of the room within the 24' span of the building (see last bulkhead image), therefore a false ceiling had to be framed.

 

With the false ceiling complete, the radius wall behind the mixing position could be framed.

 

An emergency job meeting.........!!

 

At this point, the auxiliary equipment rack in ctrl room was built.

Page 5